The 5th Asia-Pacific Industrial Engineering and Management Systems Conference &
The 7th Asia-Pacific Division Meeting of the International Foundation of Production Research, 2004
Gold Coast, Australia
(APIEMS 2004)



Proceedings

Scheduling

31.1

DECISION PROCESS ANALYSIS IN THE CONSUMER BEHAVIOR
Kyoka Kawasaki, Iduru Hayashi and Ishino Fukuya

31.2

A GLOBAL ATP COMPUTING SYSTEM FOR ORDER PROMISING
James T. Lin and Juin-Han Chen

31.3

A PERFORMANCE MEASUREMENT OF A CONSTRUCTION PROJECT IN KOREA
Soo-Yong Kim and Jong-Chool Lee

31.4

A VALIDATION ON ESTIMATE AT COMPLETION EVALUATION METHODS OF BUILDING FRAMEWORK IN KOREA
Soo-Yong Kim, Jin-Ho Jeong and Shon In- Shik

31.5

AN ANT COLONY APPROACH TO RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS
Yun-Chia Liang, Angela H. l. Chen, Wen-Ching Kao and Chiuh-Cheng Chyu

31.6

AN INFORMATION DEDUCTION APPROACH FOR QUANTIFYING THE DEPENDENCY BETWEEN DESIGN TASKS
Chun-Hsien Chen, Li Pheng Khoo and Limin Jiao

31.7

AN OVERALL RSI FILTERED MODEL FOR INVESTING STRATEGY
Chir-Ho Chang and Jin-Ling Lin

31.8

BALANCING AUTOMATED ELECTRONICS ASSEMBLY LINES
M. Schleusener, M. Grunow and Hans-Otto Günther

31.9

COLLECTIVE WORK IN DYNAMIC INTER-ORGANIZATIONAL SCHEDULING
Kaveh Nezamirad, Peter G Higgins and Simon Dunstall

31.10

CONCEPTUAL DESIGN OF RISK MANAGEMENT FRAMEWORK FOR FINANCIAL CRM SYSTEM
Yuki Imai, Shingo Nishimura and Akinori Tomita

31.11

CONTINUOUS TASKS SCHEDULING IN REAL-TIME MULTIPROCESSOR SYSTEM USING GENETIC ALGORITHM
Myungryun Yoo and Mitsuo Gen

31.12

DECOMPOSITION-BASED MAKESPAN MINIMIZATION IN JOB SHOPS
Katsumi Morikawa and Katsuhiko Takahashi

31.13

DISPATCHING CONTROL AT TRANSFER STATIONS IN TRANSIT NETWORKS
Ching-Jung Ting

31.14

DUE-DATE CONFORMANCE ORIENTED PRODUCTION SCHEDULING METHOD WITH WORKER SKILL DIFFERENCE CONSIDERATION
Masahiro Arakawa, Hiroshi Sekine, Masahiko Fuyuki and Ichiro Inoue

31.15

HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULING PROBLEM WITH INCOMPATIBLE JOB FAMILIES
Byung-Jun Joo and Yeong-Dae Kim

31.16

INFLUENCE OF TIME TO WALK BACK FOR THE SELF-BALANCING PRODUCTION LINE
Daisuke Hirotani, Myreshka, Katsumi Morikawa and Katsuhiko Takahashi

31.17

LAGRANGIAN DECOMPOSITION AND COORDINATION BASED ALGORITHM TO SOLVE A TWO-STAGE HYBRID FLOWSHOP SCHEDULING PROBLEM
Takashi Irohara and Yasuo Mitamura

31.18

LEAN STRATEGIES FOR FURNITURE MANUFACTURING
M. E. S. Sabri and Ebrahim Shayan

31.19

MINIMIZING MAKESPAN ON A TWO-MACHINE RE-ENTRANT FLOWSHOP
Seong-Woo Choi and Yeong-Dae Kim

31.20

MINIMIZING MEAN FLOW TIME FOR UNRELATED PARALLEL MACHINES
Chih-Ping Chiang

31.21

MINIMIZING TOTAL TARDINESS IN AN IDENTICAL-PARALLEL MACHINE SCHEDULING PROBLEM
Sang-Oh Shim and Yeong-Dae Kim

31.22

NET FUTURE VALUE CRITERION CONSIDERING INITIAL FUNDS ON HAND
Tadahiro Mizumachi

31.23

OPTIMAL INVENTORY MANAGEMENT POLICY FOR REUSABLE ITEMS
Hark Hwang, Dae-Won Choi, Jae-Won Ha and Shie-Gheun Koh

31.24

PERFORMANCE EVALUATION OF AGV DISPATCHING STRATEGIES AT AUTOMATED CONTAINER TERMINALS
Matthias Lehmann, M. Grunow and Hans-Otto Günther

31.25

PRODUCTION AND SCM FOR PRODUCTS WHOSE VALUE DIMINISH BY TIME
Ishino Fukuya, Satoshi Watanabe, Kyoka Kawasaki and Seongcheol Lim

31.26

PRODUCTION SCHEDULING FOR TEXTILE DYEING
Hsi-Mei Hsu, Wei-Chin Hsu and Jen-Yao Tsai

31.27

SIMULATED ANNEALING TO MINIMIZE TOTAL WEIGHTED COMPLETION TIME FOR PHARMACEUTICAL PLANTS
Fuh-Der Chou, Hui-Mei Wang and Shih-Shen Chou

31.28

TWO LEVEL BATCH PROCESSING PROBLEM
Jan Pelikan

31.29

USING GROUP SETUP STRATEGIES FOR MAKESPAN MINIMIZATION IN ELECTRONICS ASSEMBLY
I. O. Yilmaz, M. Grunow, Hans-Otto Günther and C. Yapan

31.30

WEIGHTED SUM-BASED GENETIC ALGORITHM FOR BICRITERIA NETWORK DESIG
Mitsuo Gen and Lin Lin



[Back]
[ASOR Home]
Last modified: 15/10/2005