The 5th Asia-Pacific Industrial Engineering and Management Systems
Conference &
The 7th Asia-Pacific Division Meeting of the International Foundation of
Production Research, 2004
Gold Coast, Australia
(APIEMS 2004)
Proceedings
Semiconductor
38.1
A MULTI-CLASS, TANDEM QUEUE MODEL FOR PRIORITY QUOTA ASSIGNMENT IN SEMICONDUCTOR MANUFACTURING
Da-Yin Liao, Chih-Jen Lee and Yu-Hsiang Lee
38.2
AN OVERVIEW OF GIS IN LOGISTICS/SCM SYSTEM
Heung-Suk Hwang
38.3
COLLABORATIVE ENGINEERING MECHANISM BETWEEN IC DESIGN HOUSE AND FOUNDRY
Ruey-Shan Guo, Yea-Huey Su and Shi-Chung Chang
38.4
DEMAND PLANNING HIERARCHY AND ITS APPLICATION TOSEMICONDUCTOR INDUSTRY
Argon Chen and Kenk Chen
38.5
DEVELOPMENT OF A PREVENTIVE MAINTENANCE ANALYTIC MODEL
Yu-Su Shum and Dah-Chuan Gong
38.6
DEVELOPMENT OF MULTI-OBJECTIVE GENETIC ALGORITHMS FOR SCHEDULING
Pei-Chann Chang, Jih-Chang Hsieh and Yen-Wen Wang
38.7
OPTIMISING WAFER SELECTION IN AN ASSEMBLY/TEST SEMICONDUCTOR MANUFACTURING ENVIRONMENT
Lowell Lorenzo
38.8
PROPERTIES OF ITERATIVE PROPORTIONAL CAPACITY ALLOCATION FOR REENTRANT LINE OPERATIONS
Ting-Kai Hwang, Shi-Chung Chang and Wen-Lin Jan
[Back]
[ASOR Home]
Last modified: 15/10/2005